Petrochemicals · 2014 – 2018

GTG (Gas-to-Gasoline) Plant, Turkmenistan

$1.5 billion synthetic-gasoline-from-natural-gas facility, designed by Kawasaki Heavy Industries.

The GTG plant, located in Akhal — 50 km from Ashgabat — represents a total investment of $1.5 billion. Engineering and design were carried out by Kawasaki Heavy Industries of Japan. Daily output: ≈ 1,800 tonnes of gasoline. Annual capacity: ≈ 600,000 tonnes of gasoline and 100,000 tonnes of LNG.

$1.5 B

Investment

600 000 t

Gasoline (yr)

100 000 t

LNG (yr)

Scope of work

  • Technological pipe fabrication — 107,000 WDI / 1,459 t
  • Overground pipe installation (product storage & loading area) — 17,000 WDI
  • Overground pipe installation (methanol storage) — 8,000 WDI
  • Overground pipe installation (waste-water treatment) — 6,000 WDI
  • Overground pipe installation (water storage) — 9,000 WDI
  • Overground pipe installation (water intake) — 1,500 WDI
  • Hydrotest and rectification — 440 packages